After the details of all aspects have been confirmed, we will start processing based on the drawings and using the effect drawings as the guide.
Sometimes we need to complete most of the procedures in the factory and finally go to the site for installation; some can be performed simultaneously with the on-site construction scheme processing and installation.
For overseas projects, we usually adopt the first scheme and optimize it in the scheme. The general process is:
Copyright © 2020 Shenzhen Fotune Decoration Materials Co., Limited. | All Rights Reserved
We are here to help you! If you close the chatbox, you will automatically receive a responsefrom us via email. Please be sure to leave yourcontact details so that we can better assist